0800 101019 Service-Hotline Free phone number
Contact form
GYERMELYI Stage
TOP PRODUCER NOW ON TOP OF AUTOMATED LOGISTICS

Gyermelyi's new warehouse system surpasses expectations

Gyermelyi AG needed a new warehouse that would keep up with expanded production and also fit into existing systems. Jungheinrich’s Cantilever racking combined with AGV ERC stackers and tailor-made systems ensure seamless integration into Gyermelyi's existing fully-automated logistics.

Challenges

  • Better storage systems needed due to production outstripping current storage capacity
  • Smooth integration into existing transport systems was required
  • Suitable fully-automated stackers were needed
  • New systems had to be compatible with WMS
  • A reliable automated connection between all three warehouses needed to be established

Solutions

  • Cantilever high-rack storage system installed
  • Connection created between new warehouse and existing transport
  • 8 Automated Guided ERC Stackers delivered with lithium-ion battery technology
  • AGVs linked to existing ERP system via the Jungheinrich Logistics Interface
  • New Logistics Interface integrated, allowing automated processes throughout

Benefits

  • Maximum storage capacity levels achieved
  • Uninterrupted delivery and removal of goods
  • Continuous automated warehouse stacking
  • Unified Warehouse Management System
  • All operations automated and continuous


GYERMELYI AG at a glance

Do you want to improve your automation?

Contact us to make an appointment for a consultation.

Stage Dividende

Your Contact

Sales

Get in touch

Other references

Need help?