0800 101019 Service-Hotline Free phone number
Contact form
Picture Case Study Sauer
Automated efficiency in the high-bay warehouse

AGVs on the rise at Sauer Polymertechnik in Föritztal

Long distances, great heights and millions of articles per day – to master the complex requirements in their automatic pallet high-bay warehouse, our customer Sauer relies on Automated Guided Vehicles (AGVs) and Jungheinrich Logistics Interface in combination with storage and retrieval machines.

Challenges

  • Integration of Automated Guided Vehicles (AGVs) into an existing automatic system with high complexity
  • Safe transport of about 7 million articles per day without damage to the goods
  • Mastering up to 100 transports per hour on an 870 meter long route
  • Optimal coordination of Warehouse Management System, control technology and AGVs

Solutions

  • Optimization of internal material flow with the help of an Automated Guided Vehicle system
  • Eleven automated ERC 213a high-lift trucks for transports between production and the high-bay warehouse
  • Jungheinrich Warehouse Management System (WMS) for holistic handling of logistics orders
  • Trucks with lithium-ion technology for fast and automatic charging cycles

Successes

  • High degree of space utilization in the 38-meter-high three-aisle and double-deep racking system
  • Maximum storage and retrieval performance thanks to a transverse trolley in the pre-zone
  • Automatic charging of AGVs for flexible and fast charging cycles
  • Fast accessibility and low error rate in the daily logistics process


Sauer Polymertechnik at a glance

Isa Köseoglu
Project Manager Engineering

"As a reliable service partner, Jungheinrich was always on our side immediately when problems occured"


You would also like to drive automation forward in your warehouse?

Then arrange your personal consultation appointment with us today.

Stage Dividende

Your Contact

Sales

Get in touch

Further case studies

Need help?